Category Description Particulars Existing Tariff as per

Tariff Order-2016

Particulars Approved as per Tariff

Order 2017

Remarks
BJ/KJ Fully subsidized by GOK Free Fully subsidized by GOK Free Fully Subsidized by GoK
Monthly Min. per Installation per Month. Rs 30/- Monthly Min. per Installation per Month. Rs 30/-
CDT(Commission Determined

Tariff) EC per KWH (Upto 18 units/ month)

596 Paise CDT(Commission

Determined Tariff) EC per

KWH (Upto 40 units/ month)

648 Paise Change in CDT Increased by

52 paise

Energy Consumption increase from 18 units to 40 units

Domestic – Applicable to Areas under Bruhat Bangalore Mahangara Palike

(BBMP),Municipal Corporations and all Urban Local Bodies 

Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.30/- FC For Ist KW Rs.40 Rs.10/- Increased
FC For addl. KW Rs.40/- FC For addl. KW Rs.50 Rs.10/- Increased
Consumption Energy Charges (EC) Consumption Energy

Charges (EC)

0 to 30 KWH 300 Ps 0 to 30 KWH 325 Ps 25 Paise  Increased
31 to 100 KWH 440 Ps 31 to 100 KWH 470 Ps 30 Paise  Increased
101 to 200 KWH 590 Ps 101 to 200 KWH 625 Ps 35 Paise  Increased
Above 200 KWH 690 Ps 201 to 300 KWH 730 Ps 40 Paise  Increased
301 to 400 KWH 735 Ps 45 Paise  Increased
401 to 500 KWH 740 Ps 50 Paise  Increased
Above 500 KWH 740 Ps 50 Paise  Increased
Domestic – Applicable to Areas under Village Panchayats Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC For Ist KW Rs.20/- FC For Ist KW Rs.25 Rs.5/- Increased
FC For addl. KW Rs.30/- FC For addl. KW Rs.40 Rs.10/- Increased
Consumption Energy Charges (EC) Consumption Energy

Charges (EC)

0 to 30 KWH 290 Ps 0 to 30 KWH 315 Ps 25 Paise  Increased
31 to 100 KWH 410 Ps 31 to 100 KWH 440 Ps 30 Paise  Increased
101 to 200 KWH 560 Ps 101 to 200 KWH 595 Ps 35 Paise  Increased
Above 200 KWH 640 Ps 201 to 300 KWH 680 Ps 40 Paise  Increased
301 to 400 KWH 685 Ps 45 Paise  Increased
401 to 500 KWH 685 Ps 45 Paise  Increased
Above 500 KWH 685 Ps 45 Paise  Increased
Pvt. Educational Institutions &

Pvt. Hospitals and Nursing

Homes: Applicable to Areas under Bruhat Bangalore

Mahanagara Palike (BBMP),

Municipal Corporations and all areas coming iunder Urban

Local Bodies

Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC per KW Rs.45/- FC per KW Rs.55 Rs.10/- Increased
FC Minimum per Month Rs.75/- FC Minimum per Month Rs.85 Rs.10/- Increased
Consumption Energy Charges (EC) Consumption Energy

Charges (EC)

0 to 200 KWH 625 Ps 0 to 200 KWH 650 Ps 25 Ps  Increased
above 200 KWH 745 Ps above 200 KWH 775 PS 30 Ps  Increased
Pvt. Educational Institutions and

Pvt. Hospital & Nursing Homes –

Applicable to Areas coming under Village Panchayats

Sanctioned Load Fixed Charge (FC) Sanctioned Load Fixed Charge (FC)
FC per KW Rs.35/- FC per KW Rs.45 Rs.10/- Increased
FC Minimum per Month Rs.60/- FC Minimum per Month Rs.70 Rs.10/- Increased
Consumption Energy Charges (EC) Consumption Energy

Charges (EC)

0 to 200 KWH 570 Ps 0 to 200 KWH 595 Ps 25 Ps  Increased
above 200 KWH 690 Ps above 200 KWH 720 Ps 30 Ps  Increased
Commercial: –Applicable to areas coming under Bruhat

Bangalore Mahangara Palike

(BBMP), Municipal Corporations and all Urban Local Bodies  

Sanctioned Load Fixed

Charge (FC)

Rs.50/- Sanctioned Load Fixed

Charge (FC)

Rs.60 Rs.10/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 50 KWH 715 Ps 0 to 50 KWH 750 Ps 35 Ps  Increased
Above 50 KWH 815 Ps Above 50 KWH 850 Ps 35 Ps  Increased
Demand Based Tariff (Optional)
Fixed charges per month per

KW

Rs.65 per KW Fixed charges per month per KW Rs.75 per KW Rs.10/- Increased
Energy Charges Energy Charges
For first 50 units 715 paise For first 50 units 750 paise 35 Ps  Increased
For the balance units 815 paise For the balance units 850 paise 35 Ps  Increased
Commercial Applicable to

Areas coming under Village Panchayats

Sanctioned Load Fixed Charge

(FC)/KW

Rs.40/- Sanctioned Load Fixed

Charge (FC)/KW

Rs.50 Rs.10/- Increased
Consumption Energy Charges (EC) Consumption Energy

Charges (EC)

0 to 50 KWH 665 Ps 0 to 50 KWH 700 Ps 35 Ps  Increased
Above 50 KWH 765  Ps Above 50 KWH 800 Ps 35 Ps  Increased
Fixed charges per month per

KW

Rs.55 per KW Fixed charges per month per KW Rs.65 per KW Rs.10/- Increased
Energy Charges Energy Charges
For first 50 units 665 paise For first 50 units 700 paise 35 Ps  Increased
For the balance units 765 paise For the balance units 800 paise 35 Ps  Increased
IP Sets – 10 HP & Below Commission Determined Tariff

(CDT)

FC per HP Commission Determined

Tariff (CDT)

Nil Free as per GoK order. (In case, GoK do not release the subsidy CDT shall be

collected from the

consumers)             Change in

CDT 48 Ps Increase

286 Ps per KWH 286 Ps per KWH 286 Ps per KWH 334
Applicable to IP Sets– Above 10

HP

FC per HP Rs 40/- FC per HP Rs.50 Rs.10/- Increased
EC per KWH 280 Ps EC per KWH 300 Ps 20 Ps  Increased
Applicable to – Hor. Nur.,

Coffee, Tea & Rubber: 10 HP & Below

FC per HP Rs.30/- FC per HP Rs.40 Rs.10/- Increased
EC per KWH 280 Ps EC per KWH 300 Ps 20 Ps  Increased
Applicable to – Hor. Nur.,

Coffee, Tea & Rubber: Above 10 HP

FC per HP Rs.40/- FC per HP Rs.50 Rs.10/- Increased
EC per KWH 280 Ps EC per KWH 300 Ps 20 Ps  Increased
Heating and Motive Power:

Applicable to Areas under

Bruhat Bangalore Mahanagara Palike and Municipal Corporations.

Sanctioned Load Fixed Charge (FC)/HP Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.35/- 5 HP & below Rs.40 Rs.5/- Increased
Above 5 HP but below 40 HP Rs.35/- Above 5 HP but below 40 HP Rs.45 Rs.10/- Increased
40 HP & above but below 67 HP Rs.45/- 40 HP & above but below 67 HP Rs.60 Rs.15/- Increased
67 HP & above Rs.110/- 67 HP & above Rs.120 Rs.10/- Increased
Above 5 HP but below 40 HP Rs.55/- Above 5 HP but below 40 HP Rs.65/- Rs.10/- Increased
40 HP & above but below 67 HP Rs.75/- 40 HP & above but below 67 HP Rs.90/- Rs.15/- Increased
67 HP & above Rs.160/- 67 HP & above Rs.170/- Rs.10/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 500 KWH  510 Ps 0 to 500 KWH 525 Ps 15 Ps  Increased
Above 500 KWH  630 Ps Above 500 KWH 650 Ps  20 Ps  Increased
Category Description Particulars Existing Tariff as per

Tariff Order-2016

Particulars Approved as per Tariff

Order 2017

Remarks
Heating and Motive Power

Applicable all Areas other than those covered under LT5(a)

Sanctioned Load Fixed Charge (FC)/HP Sanctioned Load Fixed Charge (FC)/HP
5 HP & below Rs.30/- 5 HP & below Rs.35 Rs.5/- Increased
Above 5 HP but below 40 HP Rs.35/- Above 5 HP but below 40 HP Rs.40 Rs.5/- Increased
40 HP & above but below 67 HP Rs.40/- 40 HP & above but below 67 HP Rs.55 Rs.15/- Increased
67 HP & above Rs.100/- 67 HP & above Rs.110 Rs.10/- Increased
Above 5 HP but below 40 HP Rs.50/- Above 5 HP but below 40 HP Rs.55/- Rs.5/- Increased
40 HP & above but below 67 HP Rs.65/- 40 HP & above but below 67 HP Rs.80/- Rs.15/- Increased
67 HP & above Rs.150/- 67 HP & above Rs.160/- Rs.10/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 500 KWH 485  Ps 0 to 500 KWH 500 Ps 15 Ps  Increased
501 to 1000 KWH 570 Ps 501 to 1000 KWH 590 Ps 20 Ps  Increased
Above 1000 KWH 600 Ps Above 1000 KWH 620 Ps 20 Ps  Increased
Water Supply FC per HP Rs.45/- FC per HP Rs.55 Rs.10/- Increased
EC per KWH 390 Ps EC per KWH 425 Ps 35 Ps  Increased
Public Lighting FC per KW Rs.60/- FC per KW Rs.70 Rs.10/- Increased
EC per KWH 550 Ps EC per KWH 585 Ps 35 Ps  Increased
EC per KWH to LED/ Induction

Lightning

450 Ps EC per KWH to LED/

Induction Lightning

 485   Ps  35 Ps  Increased
Temporary Power Supply for all purposes Less than 67 HP Weekly Min.per.KW Rs.170/- Less than 67 HP Weekly Min.per.KW Rs.190 Weekly Min: Rs.20/- Increased
EC per KWH   950 Ps EC per KWH 1000 Ps E.C: 50 Ps  Increased
Hoarding & Adveristment :Power

Supply on permanent connection basis

Fixed charges per month per

KW

Rs.50/- Fixed charges per month per KW Rs.60 Rs.10/- Increased
EC per KWH   950 Ps EC per KWH 1000 Ps E.C:  :  50 Ps  Increased
HT Water Supply DC per KVA Rs.190/- DC per KVA Rs.200 Rs.10/- Increased
EC per KWH 450 Ps EC per KWH 485 Ps 35 Ps  Increased
HT Industrial: Applicable to

Areas under  Bruhat Bangalore Mahanagara Palike and  Municipal Corporations.

Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210 Rs.20/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 1 Lakh KWH 625  Ps 0 to 1 Lakh KWH 665 Ps 40  Ps  Increased
Above 1 Lakh KWH  675 Ps Above 1 Lakh KWH 695 Ps 20 Ps  Increased
Applicable to Bangalore

Metropolitan Railway

Corporation Ltd. (BMRCL).

Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210 Rs.  20/- Increased
Consumption Energy Charges

(EC)

570 Ps Consumption Energy Charges (EC)  600 Ps  30 Ps  Increased
HT Industrial: Applicable to

Areas other than those covered under HT-2(a)(i)

Demand Charges (DC) per KVA Rs.180/- Demand Charges (DC) per KVA Rs.200 Rs.20/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 1 Lakh KWH 620  Ps 0 to 1 Lakh KWH 660 Ps 40  Ps  Increased
Above 1 Lakh KWH 660 Ps Above 1 Lakh KWH 680 Ps 20 Ps  Increased
Railway Traction and Effluent Treatment Plants Demand Charges (DC) per KVA Rs.190/- Demand Charges (DC) per KVA Rs.210/- Rs.   20/- Increased
Consumption Energy Charges (EC) per KWH 590 Ps Consumption Energy Charges (EC) per KWH 620 Ps             30 Ps  Increased
HT Commercial Arears under

Bruhat Bangalore Mahanagara Palike and  Municipal Corporations.

Demand Charges (DC) per KVA Rs.210/- Demand Charges (DC) per KVA Rs.230 Rs.20/- Increased
Consumption Energy Charges

(EC)

Consumption Energy Charges (EC)
0 to 2 Lakhs KWH 805 Ps 0 to 2 Lakhs KWH 845 Ps 40  Ps  Increased
Above 2 Lakhs KWH  835 Ps Above 2 Lakhs KWH 855 Ps 20 Ps  Increased
HT Commercial Applicable to

Areas other than those covered under HT-2(b)(i)

Demand Charges (DC) per KVA Rs.200/- Demand Charges (DC) per KVA Rs.220 Rs.20/- Increased
Consumption Consumption
0 to 2 Lakhs KWH 785 Ps 0 to 2 Lakhs KWH 825 Ps 40  Ps  Increased
Above 2 Lakhs KWH 815 Ps Above 2 Lakhs KWH 835 Ps 20 Ps  Increased
Applicable to Government

Hospitals & Hospitals run by

Charitable Institutions & ESI

Hospitals and Educational

Institutions belonging to Govt. ,

Local Bodies & Aided Institutions and Hostels of all Educational

Institutions,

Demand Charges (DC)per KVA Rs.180/- Demand Charges (DC)per KVA Rs.200 Rs.20/- Increased
0 to 1 Lakh KWH 600  Ps 0 to 1 Lakh KWH 640 Ps 40  Ps  Increased
Above 1 Lakh KWH 650  Ps Above 1 Lakh KWH 680 Ps 30  Ps  Increased
Applicable to Hospitals and

Educational Institutions other than those covered under

HT2(C) (i) 

Demand Charges (DC)per KVA Rs.180/- Demand Charges (DC)per KVA Rs.200 Rs.20/- Increased
0 to 1 Lakh KWH 700  Ps 0 to 1 Lakh KWH 740 Ps 40 Ps  Increased
Above 1 Lakh KWH 750 Ps Above 1 Lakh KWH 780 Ps 30 Ps  Increased
HT Lift Irrigation Schemes under

Government

Depts./Corporations.

EC per KWH and Annual Minimum 200 Ps subject to  Min. of

Rs. 1120/- per  HP per

annum

EC per KWH and Annual Minimum 225 Ps subject to  Min. of

Rs. 1240/- per  HP per

annum

EC ; 25 Ps  Increased        

Rs.120/- increase in Annual Minimum Charges

HT Private Lift Irrigation

Schemes/Societies : Connected to Urban / Express feeders

F.C. per HP /PM Rs.40/- F.C. per HP /PM Rs.50 Rs.10/- Increased
E.C. per KWH 200 Ps E.C. per KWH 225 Ps 25 Ps Increased
HT Private Lift Irrigation Schemes

/Societies  other than those covered under HT-3 (a)(ii) (Not

Connected to Urban / Express feeders)

F.C. per HP/PM Rs.20/- F.C. per HP/PM Rs.30 Rs.10/- Increased
E.C. per KWH 200 Ps E.C. per KWH 225 Ps 25 Ps  Increased
HT supply to Agriculture/ Horticulture Farms EC per KWH and Annual Minimum 400 Ps subject to  Min. of Rs. 1120/- per  HP per

annum

EC per KWH and Annual Minimum 425 Ps subject to  Min. of Rs. 1240/- per  HP per

annum

  EC ;25 Ps  Increased         

Rs.120/- increase in Annual

Minimum Charges          

HT Res. Apartments Applicable to all areas DC per KVA Rs 110/- DC per KVA Rs.120 Rs.10/- Increased
EC per KWH 585 Ps EC per KWH 620 Ps 35 Ps  Increased
Temporary Supply Fixed Charges/ Demand Charges Rs. 220/HP/Month for the entire sanctioned load /

Contract demand

Fixed Charges/ Demand Charges Rs. 240/HP/Month for the entire sanctioned load /

Contract demand

Rs.20/- Increased
Energy Charges 950 Ps Energy Charges 1000 Ps 50 Ps  Increased
Temporary Supply            

(Bangalore International Exhibition Centre).

 

Weekly Min. per KW

No Weekly Minimum charges Weekly Min. per KW No Weekly Minimum charges EC: 50 Ps  Increased
EC per KWH 1050 paise EC per KWH              1100   Ps
Existing ToD Proposed ToD Approved ToD
Time of day Increase(+)/reduction(-) in energy charges  over the normal tariff

applicable

Time of day Increase(+)/reduction(-) in energy charges  over the normal tariff applicable Increase(+)/reduction(-) in energy charges  over the normal tariff applicable
22.00Hrs to 06.00Hrs (-)125 paise per Unit 06.00Hrs to 10.00Hrs (+)100 paise per Unit (+)100 paise per Unit
06.00Hrs to18.00Hrs 0 10.00Hrs to18.00Hrs 0 0
18.00Hrs to 22.00Hrs (+)100 paise per unit 18.00Hrs to 22.00Hrs (+)100 paise per unit (+)100 paise per unit
22.00Hrs to 06.00Hrs 0 (-)100 paise per unit
Spread the love