Category Description | Particulars | Existing Tariff as per
Tariff Order-2016 |
Particulars | Approved as per Tariff
Order 2017 |
Remarks | ||
BJ/KJ | Fully subsidized by GOK | Free | Fully subsidized by GOK | Free | Fully Subsidized by GoK | ||
Monthly Min. per Installation per Month. | Rs 30/- | Monthly Min. per Installation per Month. | Rs 30/- | ||||
CDT(Commission Determined
Tariff) EC per KWH (Upto 18 units/ month) |
596 Paise | CDT(Commission
Determined Tariff) EC per KWH (Upto 40 units/ month) |
648 Paise | Change in CDT Increased by
52 paise Energy Consumption increase from 18 units to 40 units |
|||
Domestic – Applicable to Areas under Bruhat Bangalore Mahangara Palike
(BBMP),Municipal Corporations and all Urban Local Bodies |
Sanctioned Load Fixed Charge (FC) | Sanctioned Load Fixed Charge (FC) | |||||
FC For Ist KW | Rs.30/- | FC For Ist KW | Rs.40 | Rs.10/- Increased | |||
FC For addl. KW | Rs.40/- | FC For addl. KW | Rs.50 | Rs.10/- Increased | |||
Consumption Energy Charges (EC) | Consumption Energy
Charges (EC) |
||||||
0 to 30 KWH | 300 Ps | 0 to 30 KWH | 325 Ps | 25 Paise Increased | |||
31 to 100 KWH | 440 Ps | 31 to 100 KWH | 470 Ps | 30 Paise Increased | |||
101 to 200 KWH | 590 Ps | 101 to 200 KWH | 625 Ps | 35 Paise Increased | |||
Above 200 KWH | 690 Ps | 201 to 300 KWH | 730 Ps | 40 Paise Increased | |||
301 to 400 KWH | 735 Ps | 45 Paise Increased | |||||
401 to 500 KWH | 740 Ps | 50 Paise Increased | |||||
Above 500 KWH | 740 Ps | 50 Paise Increased | |||||
Domestic – Applicable to Areas under Village Panchayats | Sanctioned Load Fixed Charge (FC) | Sanctioned Load Fixed Charge (FC) | |||||
FC For Ist KW | Rs.20/- | FC For Ist KW | Rs.25 | Rs.5/- Increased | |||
FC For addl. KW | Rs.30/- | FC For addl. KW | Rs.40 | Rs.10/- Increased | |||
Consumption Energy Charges (EC) | Consumption Energy
Charges (EC) |
||||||
0 to 30 KWH | 290 Ps | 0 to 30 KWH | 315 Ps | 25 Paise Increased | |||
31 to 100 KWH | 410 Ps | 31 to 100 KWH | 440 Ps | 30 Paise Increased | |||
101 to 200 KWH | 560 Ps | 101 to 200 KWH | 595 Ps | 35 Paise Increased | |||
Above 200 KWH | 640 Ps | 201 to 300 KWH | 680 Ps | 40 Paise Increased | |||
301 to 400 KWH | 685 Ps | 45 Paise Increased | |||||
401 to 500 KWH | 685 Ps | 45 Paise Increased | |||||
Above 500 KWH | 685 Ps | 45 Paise Increased | |||||
Pvt. Educational Institutions &
Pvt. Hospitals and Nursing Homes: Applicable to Areas under Bruhat Bangalore Mahanagara Palike (BBMP), Municipal Corporations and all areas coming iunder Urban Local Bodies |
Sanctioned Load Fixed Charge (FC) | Sanctioned Load Fixed Charge (FC) | |||||
FC per KW | Rs.45/- | FC per KW | Rs.55 | Rs.10/- Increased | |||
FC Minimum per Month | Rs.75/- | FC Minimum per Month | Rs.85 | Rs.10/- Increased | |||
Consumption Energy Charges (EC) | Consumption Energy
Charges (EC) |
||||||
0 to 200 KWH | 625 Ps | 0 to 200 KWH | 650 Ps | 25 Ps Increased | |||
above 200 KWH | 745 Ps | above 200 KWH | 775 PS | 30 Ps Increased | |||
Pvt. Educational Institutions and
Pvt. Hospital & Nursing Homes – Applicable to Areas coming under Village Panchayats |
Sanctioned Load Fixed Charge (FC) | Sanctioned Load Fixed Charge (FC) | |||||
FC per KW | Rs.35/- | FC per KW | Rs.45 | Rs.10/- Increased | |||
FC Minimum per Month | Rs.60/- | FC Minimum per Month | Rs.70 | Rs.10/- Increased | |||
Consumption Energy Charges (EC) | Consumption Energy
Charges (EC) |
||||||
0 to 200 KWH | 570 Ps | 0 to 200 KWH | 595 Ps | 25 Ps Increased | |||
above 200 KWH | 690 Ps | above 200 KWH | 720 Ps | 30 Ps Increased | |||
Commercial: –Applicable to areas coming under Bruhat
Bangalore Mahangara Palike (BBMP), Municipal Corporations and all Urban Local Bodies  |
Sanctioned Load Fixed
Charge (FC) |
Rs.50/- | Sanctioned Load Fixed
Charge (FC) |
Rs.60 | Rs.10/- Increased | ||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | ||||||
0 to 50 KWH | 715 Ps | 0 to 50 KWH | 750 Ps | 35 Ps Increased | |||
Above 50 KWH | 815 Ps | Above 50 KWH | 850 Ps | 35 Ps Increased | |||
Demand Based Tariff (Optional) | |||||||
Fixed charges per month per
KW |
Rs.65 per KW | Fixed charges per month per KW | Rs.75 per KW | Rs.10/- Increased | |||
Energy Charges | Energy Charges | ||||||
For first 50 units | 715 paise | For first 50 units | 750 paise | 35 Ps Increased | |||
For the balance units | 815 paise | For the balance units | 850 paise | 35 Ps Increased | |||
Commercial Applicable to
Areas coming under Village Panchayats |
Sanctioned Load Fixed Charge
(FC)/KW |
Rs.40/- | Sanctioned Load Fixed
Charge (FC)/KW |
Rs.50 | Rs.10/- Increased | ||
Consumption Energy Charges (EC) | Consumption Energy
Charges (EC) |
||||||
0 to 50 KWH | 665 Ps | 0 to 50 KWH | 700 Ps | 35 Ps Increased | |||
Above 50 KWH | 765 Ps | Above 50 KWH | 800 Ps | 35 Ps Increased | |||
Fixed charges per month per
KW |
Rs.55 per KW | Fixed charges per month per KW | Rs.65 per KW | Rs.10/- Increased | |||
Energy Charges | Energy Charges | ||||||
For first 50 units | 665 paise | For first 50 units | 700 paise | 35 Ps Increased | |||
For the balance units | 765 paise | For the balance units | 800 paise | 35 Ps Increased | |||
IP Sets – 10 HP & Below | Commission Determined Tariff
(CDT) |
FC per HP | Commission Determined
Tariff (CDT) |
Nil | Free as per GoK order. (In case, GoK do not release the subsidy CDT shall be
collected from the consumers)Â Â Â Â Â Â Â Â Â Â Â Â Change in CDT 48 Ps Increase |
||
286 Ps per KWH | 286 Ps per KWH | 286 Ps per KWH | 334 | ||||
Applicable to IP Sets– Above 10
HP |
FC per HP | Rs 40/- | FC per HP | Rs.50 | Rs.10/- Increased | ||
EC per KWH | 280 Ps | EC per KWH | 300 Ps | 20 Ps Increased | |||
Applicable to – Hor. Nur.,
Coffee, Tea & Rubber: 10 HP & Below |
FC per HP | Rs.30/- | FC per HP | Rs.40 | Rs.10/- Increased | ||
EC per KWH | 280 Ps | EC per KWH | 300 Ps | 20 Ps Increased | |||
Applicable to – Hor. Nur.,
Coffee, Tea & Rubber: Above 10 HP |
FC per HP | Rs.40/- | FC per HP | Rs.50 | Rs.10/- Increased | ||
EC per KWH | 280 Ps | EC per KWH | 300 Ps | 20 Ps Increased | |||
Heating and Motive Power:
Applicable to Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations. |
Sanctioned Load Fixed Charge (FC)/HP | Sanctioned Load Fixed Charge (FC)/HP | |||||
5 HP & below | Rs.35/- | 5 HP & below | Rs.40 | Rs.5/- Increased | |||
Above 5 HP but below 40 HP | Rs.35/- | Above 5 HP but below 40 HP | Rs.45 | Rs.10/- Increased | |||
40 HP & above but below 67 HP | Rs.45/- | 40 HP & above but below 67 HP | Rs.60 | Rs.15/- Increased | |||
67 HP & above | Rs.110/- | 67 HP & above | Rs.120 | Rs.10/- Increased | |||
Above 5 HP but below 40 HP | Rs.55/- | Above 5 HP but below 40 HP | Rs.65/- | Rs.10/- Increased |
40 HP & above but below 67 HP | Rs.75/- | 40 HP & above but below 67 HP | Rs.90/- | Rs.15/- Increased | ||||
67 HP & above | Rs.160/- | 67 HP & above | Rs.170/- | Rs.10/- Increased | ||||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | |||||||
0 to 500 KWH |  510 Ps | 0 to 500 KWH | 525 Ps | 15 Ps Increased | ||||
Above 500 KWH |  630 Ps | Above 500 KWH | 650 Ps |  20 Ps Increased | ||||
Category Description | Particulars | Existing Tariff as per
Tariff Order-2016 |
Particulars | Approved as per Tariff
Order 2017 |
Remarks | |||
Heating and Motive Power
Applicable all Areas other than those covered under LT5(a) |
Sanctioned Load Fixed Charge (FC)/HP | Sanctioned Load Fixed Charge (FC)/HP | ||||||
5 HP & below | Rs.30/- | 5 HP & below | Rs.35 | Rs.5/- Increased | ||||
Above 5 HP but below 40 HP | Rs.35/- | Above 5 HP but below 40 HP | Rs.40 | Rs.5/- Increased | ||||
40 HP & above but below 67 HP | Rs.40/- | 40 HP & above but below 67 HP | Rs.55 | Rs.15/- Increased | ||||
67 HP & above | Rs.100/- | 67 HP & above | Rs.110 | Rs.10/- Increased | ||||
Above 5 HP but below 40 HP | Rs.50/- | Above 5 HP but below 40 HP | Rs.55/- | Rs.5/- Increased | ||||
40 HP & above but below 67 HP | Rs.65/- | 40 HP & above but below 67 HP | Rs.80/- | Rs.15/- Increased | ||||
67 HP & above | Rs.150/- | 67 HP & above | Rs.160/- | Rs.10/- Increased | ||||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | |||||||
0 to 500 KWH | 485 Ps | 0 to 500 KWH | 500 Ps | 15 Ps Increased | ||||
501 to 1000 KWH | 570 Ps | 501 to 1000 KWH | 590 Ps | 20 Ps Increased | ||||
Above 1000 KWH | 600 Ps | Above 1000 KWH | 620 Ps | 20 Ps Increased | ||||
Water Supply | FC per HP | Rs.45/- | FC per HP | Rs.55 | Rs.10/- Increased | |||
EC per KWH | 390 Ps | EC per KWH | 425 Ps | 35 Ps Increased | ||||
Public Lighting | FC per KW | Rs.60/- | FC per KW | Rs.70 | Rs.10/- Increased | |||
EC per KWH | 550 Ps | EC per KWH | 585 Ps | 35 Ps Increased | ||||
EC per KWH to LED/ Induction
Lightning |
450 Ps | EC per KWH to LED/
Induction Lightning |
 485  Ps |  35 Ps Increased | ||||
Temporary Power Supply for all purposes | Less than 67 HP Weekly Min.per.KW | Rs.170/- | Less than 67 HP Weekly Min.per.KW | Rs.190 | Weekly Min: Rs.20/- Increased | |||
EC per KWH |  950 Ps | EC per KWH | 1000 Ps | E.C: 50 Ps Increased | ||||
Hoarding & Adveristment :Power
Supply on permanent connection basis |
Fixed charges per month per
KW |
Rs.50/- | Fixed charges per month per KW | Rs.60 | Rs.10/- Increased | |||
EC per KWH |  950 Ps | EC per KWH | 1000 Ps | E.C: : 50 Ps Increased | ||||
HT Water Supply | DC per KVA | Rs.190/- | DC per KVA | Rs.200 | Rs.10/- Increased | |||
EC per KWH | 450 Ps | EC per KWH | 485 Ps | 35 Ps Increased | ||||
HT Industrial: Applicable to
Areas under Bruhat Bangalore Mahanagara Palike and Municipal Corporations. |
Demand Charges (DC) per KVA | Rs.190/- | Demand Charges (DC) per KVA | Rs.210 | Rs.20/- Increased | |||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | |||||||
0 to 1 Lakh KWH | 625 Ps | 0 to 1 Lakh KWH | 665 Ps | 40 Ps Increased | ||||
Above 1 Lakh KWH |  675 Ps | Above 1 Lakh KWH | 695 Ps | 20 Ps Increased | ||||
Applicable to Bangalore
Metropolitan Railway Corporation Ltd. (BMRCL). |
Demand Charges (DC) per KVA | Rs.190/- | Demand Charges (DC) per KVA | Rs.210 | Rs. 20/- Increased | |||
Consumption Energy Charges
(EC) |
570 Ps | Consumption Energy Charges (EC) |  600 Ps |  30 Ps Increased | ||||
HT Industrial: Applicable to
Areas other than those covered under HT-2(a)(i) |
Demand Charges (DC) per KVA | Rs.180/- | Demand Charges (DC) per KVA | Rs.200 | Rs.20/- Increased | |||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | |||||||
0 to 1 Lakh KWH | 620 Ps | 0 to 1 Lakh KWH | 660 Ps | 40 Ps Increased | ||||
Above 1 Lakh KWH | 660 Ps | Above 1 Lakh KWH | 680 Ps | 20 Ps Increased | ||||
Railway Traction and Effluent Treatment Plants | Demand Charges (DC) per KVA | Rs.190/- | Demand Charges (DC) per KVA | Rs.210/- | Rs.  20/- Increased | |||
Consumption Energy Charges (EC) per KWH | 590 Ps | Consumption Energy Charges (EC) per KWH | 620 Ps |            30 Ps Increased | ||||
HT Commercial Arears under
Bruhat Bangalore Mahanagara Palike and Municipal Corporations. |
Demand Charges (DC) per KVA | Rs.210/- | Demand Charges (DC) per KVA | Rs.230 | Rs.20/- Increased | |||
Consumption Energy Charges
(EC) |
Consumption Energy Charges (EC) | |||||||
0 to 2 Lakhs KWH | 805 Ps | 0 to 2 Lakhs KWH | 845 Ps | 40 Ps Increased | ||||
Above 2 Lakhs KWH |  835 Ps | Above 2 Lakhs KWH | 855 Ps | 20 Ps Increased | ||||
HT Commercial Applicable to
Areas other than those covered under HT-2(b)(i) |
Demand Charges (DC) per KVA | Rs.200/- | Demand Charges (DC) per KVA | Rs.220 | Rs.20/- Increased | |||
Consumption | Consumption | |||||||
0 to 2 Lakhs KWH | 785 Ps | 0 to 2 Lakhs KWH | 825 Ps | 40 Ps Increased | ||||
Above 2 Lakhs KWH | 815 Ps | Above 2 Lakhs KWH | 835 Ps | 20 Ps Increased | ||||
Applicable to Government
Hospitals & Hospitals run by Charitable Institutions & ESI Hospitals and Educational Institutions belonging to Govt. , Local Bodies & Aided Institutions and Hostels of all Educational Institutions, |
Demand Charges (DC)per KVA | Rs.180/- | Demand Charges (DC)per KVA | Rs.200 | Rs.20/- Increased | |||
0 to 1 Lakh KWH | 600 Ps | 0 to 1 Lakh KWH | 640 Ps | 40 Ps Increased | ||||
Above 1 Lakh KWH | 650 Ps | Above 1 Lakh KWH | 680 Ps | 30 Ps Increased | ||||
Applicable to Hospitals and
Educational Institutions other than those covered under HT2(C) (i)Â |
Demand Charges (DC)per KVA | Rs.180/- | Demand Charges (DC)per KVA | Rs.200 | Rs.20/- Increased | |||
0 to 1 Lakh KWH | 700 Ps | 0 to 1 Lakh KWH | 740 Ps | 40 Ps Increased | ||||
Above 1 Lakh KWH | 750 Ps | Above 1 Lakh KWH | 780 Ps | 30 Ps Increased | ||||
HT Lift Irrigation Schemes under
Government Depts./Corporations. |
EC per KWH and Annual Minimum | 200 Ps subject to Min. of
Rs. 1120/- per HP per annum |
EC per KWH and Annual Minimum | 225 Ps subject to Min. of
Rs. 1240/- per HP per annum |
EC ; 25 Ps Increased       Â
Rs.120/- increase in Annual Minimum Charges |
|||
HT Private Lift Irrigation
Schemes/Societies : Connected to Urban / Express feeders |
F.C. per HP /PM | Rs.40/- | F.C. per HP /PM | Rs.50 | Rs.10/- Increased | |||
E.C. per KWH | 200 Ps | E.C. per KWH | 225 Ps | 25 Ps Increased | ||||
HT Private Lift Irrigation Schemes
/Societies other than those covered under HT-3 (a)(ii) (Not Connected to Urban / Express feeders) |
F.C. per HP/PM | Rs.20/- | F.C. per HP/PM | Rs.30 | Rs.10/- Increased | |||
E.C. per KWH | 200 Ps | E.C. per KWH | 225 Ps | 25 Ps Increased | ||||
HT supply to Agriculture/ Horticulture Farms | EC per KWH and Annual Minimum | 400 Ps subject to Min. of Rs. 1120/- per HP per
annum |
EC per KWH and Annual Minimum | 425 Ps subject to Min. of Rs. 1240/- per HP per
annum |
 EC ;25 Ps Increased       Â
Rs.120/- increase in Annual Minimum Charges          |
|||
HT Res. Apartments Applicable to all areas | DC per KVA | Rs 110/- | DC per KVA | Rs.120 | Rs.10/- Increased | |||
EC per KWH | 585 Ps | EC per KWH | 620 Ps | 35 Ps Increased |
Temporary Supply | Fixed Charges/ Demand Charges | Rs. 220/HP/Month for the entire sanctioned load /
Contract demand |
Fixed Charges/ Demand Charges | Rs. 240/HP/Month for the entire sanctioned load /
Contract demand |
Rs.20/- Increased | ||||||
Energy Charges | 950 Ps | Energy Charges | 1000 Ps | 50 Ps Increased | |||||||
Temporary Supply           Â
(Bangalore International Exhibition Centre). |
Â
Weekly Min. per KW |
No Weekly Minimum charges | Weekly Min. per KW | No Weekly Minimum charges | EC: 50 Ps Increased | ||||||
EC per KWH | 1050 paise | EC per KWH | Â Â Â Â Â Â Â Â Â Â Â Â 1100Â Â Ps | ||||||||
Existing ToD | Proposed ToD | Approved ToD | |||||||||
Time of day | Increase(+)/reduction(-) in energy charges over the normal tariff
applicable |
Time of day | Increase(+)/reduction(-) in energy charges over the normal tariff applicable | Increase(+)/reduction(-) in energy charges over the normal tariff applicable | |||||||
22.00Hrs to 06.00Hrs | (-)125 paise per Unit | 06.00Hrs to 10.00Hrs | (+)100 paise per Unit | (+)100 paise per Unit | |||||||
06.00Hrs to18.00Hrs | 0 | 10.00Hrs to18.00Hrs | 0 | 0 | |||||||
18.00Hrs to 22.00Hrs | (+)100 paise per unit | 18.00Hrs to 22.00Hrs | (+)100 paise per unit | (+)100 paise per unit | |||||||
22.00Hrs to 06.00Hrs | 0 | (-)100 paise per unit |